VerdLynx← verdlynx.com

Guides

Packaging compliance, in plain English

Plain-English guides to EU PPWR, the Declaration of Conformity, the Digital Product Passport, and UK packaging EPR — written for packaging and compliance teams.

The Final PPWR Guidance in Plain English: What Actually Applies on 12 August 2026

The EU Commission's final PPWR guidance, decoded. PFAS limits, the Declaration of Conformity, and what packaging teams must do before 12 August 2026.

Read the guide →

Der finale PPWR-Leitfaden verständlich erklärt: Was am 12. August 2026 wirklich gilt

Der finale PPWR-Leitfaden der EU-Kommission, verständlich erklärt. PFAS-Grenzwerte, die Konformitätserklärung und was Verpackungsteams bis zum 12. August 2026 erledigen müssen.

Auf Deutsch lesen →

PPWR Declaration of Conformity: What Goes In It, Who Signs — With a Full Example

A plain-English guide to the PPWR Declaration of Conformity with a complete worked example: what Annex VIII requires, who must sign it, and how importers collect suppliers' DoCs.

Read the guide →

PPWR Compliance Software: How to Choose (2026)

The capabilities that matter before 12 August 2026 — Declaration of Conformity, PFAS/substances, recyclability, artwork markings, DPP, EPR fees, supplier collection — and the main types of tools.

Read the guide →

PPWR: Paying EPR Fees Is Not the Same as Having a Declaration of Conformity

EPR fees and the Declaration of Conformity are two separate PPWR obligations. Why fee-calculation tools don't produce a DoC, and what actually falls due on 12 August 2026.

Read the guide →

The PPWR Readiness Checklist — What to Have Done by 12 August 2026

A practical, printable checklist for the PPWR's day-one obligations: scope your packaging, gather substance and PFAS evidence, prepare the Declaration of Conformity, and keep EPR on its own track.

Read the guide →

PFAS in Food-Contact Packaging: the PPWR Limits and the Evidence You Need (2026)

From 12 August 2026 the PPWR restricts PFAS in food-contact packaging — 25 ppb / 250 ppb / 50 ppm. What the limits mean, why a supplier declaration alone often isn't enough, and what a lab CoA needs to show.

Read the guide →

The EU's DPP Registry Deadline Has Passed. Here's What It Actually Means for Packaging

The ESPR Article 13 deadline for the EU's central DPP Registry fell on 19 July 2026. What it changes for packaging data, QR labelling and GS1 — and what it doesn't.

Read the guide →

UK Packaging EPR (pEPR) Explained: Deadlines, Fees and RAM 2027

PackUK, the 1 September 2026 data resubmission deadline, recyclability-modulated fees, the RAM 2027 red/amber/green ratings, and how it relates to EU PPWR.

Read the guide →